
NEWS
06/16/2009 - Negotiations Held at the Top Level
The topic of negotiations held on the 15th of May, 2009 between the Director General of OOO “Stroycomplect-2” (Limited Liability Company), Mr. Yury Rekunov, and the Minister of Works and Transportation of the Republic of Uganda, Mr. John Byabagambi, was reconstruction of a railway network in the Republic of Uganda with the view of improvement of its traffic capacity.



ÎÎÎ Rus (Limited Liability Company), Lobnya
Designing and construction of a platform for unloading of goods from closed carriages. Designing and construction of a railway track of 680 linear meters including laying of four new power switches, type Ð50, mark 1/9.

Loading platform

Railway siding track to a loading platform