Domodedovo Airport

Complete overhaul of 525 linear meters of a railway track and complete replacement of 8 power switches of the following marks: Ð-50 1/9 and Ð-65 1/9. The works were carried out on a heavy traffic hazardous goods line at the intervals of 2-4 hours.

 

  back to the gallery 

Railway siding layout following the reconstruction
Power switches on the premises of the airport