MTF Plant “Mokon”

Complete overhaul of 200 linear meters of a railway track and 3 power switches. Due to a great capacity of loading non-reactive cargoes disassembling and laying of the track was completed in six hours.

 

  back to the gallery 

Laying of a railway skeleton at the loose materials storehouse with UK 25/21 track crane